
Grid & Compliance
The numbers behind every scheme, in one place.
UK schemes and the data they rely on
WorkyPower does not replace your supplier or Ofgem. It keeps the measured generation, export and documents each scheme depends on, so checks take minutes.
REGO
Ofgem issues one Renewable Energy Guarantee of Origin per MWh of eligible renewable output.
How WorkyPower helps: Monthly generation per station, kept and exportable, to check against what you submit.
Official sourceSmart Export Guarantee (SEG)
Licensed suppliers pay eligible small-scale generators for electricity exported to the grid, measured by an export meter.
How WorkyPower helps: Export kWh per month from your meters, so you can check supplier statements.
Official sourceG98 / G99 grid connection
Energy Networks Association engineering recommendations for connecting generation to distribution networks.
How WorkyPower helps: Export limits and curtailment events visible per site, with alarms when limits are breached.
Official sourceMCS certification
Certification scheme for small-scale installations; commonly needed for SEG eligibility on smaller systems.
How WorkyPower helps: Store certificates and commissioning documents against each plant.
Official sourceLegacy Feed-in Tariff
Closed to new applicants, but many existing sites still submit generation meter reads to their FiT licensee.
How WorkyPower helps: Generation meter readings by date, ready for periodic submissions.
Official sourceSummary for orientation only, not legal or regulatory advice.
Audit trail
Every reading, timestamped and exportable
Raw and validated data, gaps flagged, changes logged. Export to CSV or Excel whenever an auditor asks.
FAQ
